September 2026 Work Party

The work party for 12th September 2026 consisted of 8 volunteers who carried out 50 hours of work improving the path surface and cutting grass. Due to the efforts of the volunteers the work carried out was as follows:

  • 8 tonnes of quarry dust was loaded into trailers by hand and used to dust over the sub-base laid in May, south of Dava. All compacted with the wacker plate to make a smooth firm surface.
  • The grass was cut on the  walkers’ bypass below Dava settlement 

Additional Works:

  • The fallen over Dava railway station sign was recovered for repair and refurbishment.

Other points to note

  • There are still some sections of loose surface stones that need to be smoothed over.