November 2026 Work Party

The work party for 14th November 2026 consisted of 14 volunteers who carried out nearly 90 hours of work improving the Drainage at Dunphail. In cold breezy conditions, the volunteers managed to carry out the following works:

  • Clear and improve about 150m of drainage ditches at the north end of the Laurels Bridge to Balvlair cutting.
  • Rod blockages in the old railway drainage pipes and identify where further action is needed to clear the pipe in the Balvlair to Laurels cutting.
  • Strim the grass and undergrowth on the west side of the Balvlair to Laurels cutting at the north end.

Additional Work

  • No additional work was carried out

Other Notes

  • Many thanks to the Edinkillie Community Association for allowing us to take shelter in the Village Hall for our refreshment breaks.
  • Further work required to cover existing and new access points into the railway drainage pipes.
  • The drainage ditch improvements on the east side of the Balvlair to Laurels cutting need to be completed.

No accidents or incidents were reported

Peter Mitchell
Dava Way Association Trustee