April 2023 Work Party
Saturday’s work party, consisting of 5 volunteers, did 42 hours of work on the Dava Way. It was very successful with most of the planned work being satisfactorily completed or progressed as follows:
- Drainage ditching and pipe rodding at the Cairn Eney cutting progressed.
- Surface improvements north and south of the Peathillock Bridge.
- The 1.5m deep sink hole was infilled at the Lochenoun stone culvert.
Additional unplanned Work:
- Side fence timber rails repaired at the Muir of Logie farm crossing.
Other points to note:
- No injuries or near misses were reported
- Further drainage work required in the Cairn Eney cutting south end to dry the path and the large pot holes need infilling
- Further path dusting and drainage work south of the Peathillock is needed
![](https://davaway.org.uk/wp-content/uploads/2023/04/IMG_8273-767x1024.jpeg)
![](https://davaway.org.uk/wp-content/uploads/2023/04/IMG_8281-767x1024.jpeg)
![](https://davaway.org.uk/wp-content/uploads/2023/04/IMG_8283-767x1024.jpeg)
![](https://davaway.org.uk/wp-content/uploads/2023/04/IMG_8284-767x1024.jpeg)
![](https://davaway.org.uk/wp-content/uploads/2023/04/IMG_8286-1024x767.jpeg)
![](https://davaway.org.uk/wp-content/uploads/2023/04/IMG_1998.jpg)
![](https://davaway.org.uk/wp-content/uploads/2023/04/IMG_2001.jpg)
![](https://davaway.org.uk/wp-content/uploads/2023/04/IMG_8269-1024x767.jpeg)
![](https://davaway.org.uk/wp-content/uploads/2023/04/IMG_8272-767x1024.jpeg)